pen-shaped lead pendant with ring streamlined fishing net casting lead pendant fishing anchor fish long lead pendant manufacturers

Price:

0,68


Factory direct bullet shaped float fish float high sensitive conical fishing float eye-catching EVA foam float
Factory direct bullet shaped float fish float high sensitive conical fishing float eye-catching EVA foam float
0,06
0,06
Genuine Power Source Danny Rich CR322 Battery Free Shipping Luminous Bleaching Battery Fish Bleaching Luminous Stick Small Battery
Genuine Power Source Danny Rich CR322 Battery Free Shipping Luminous Bleaching Battery Fish Bleaching Luminous Stick Small Battery
0,44
0,44

pen-shaped lead pendant with ring streamlined fishing net casting lead pendant fishing anchor fish long lead pendant manufacturers

https://emutree.com/web/image/product.template/18776/image_1920?unique=4cd1787

Discount No Discount
Quantity ≥ 10 pieces

0,68 0.68 AUD 0,68

0,00

Not Available For Sale


  • Shape

Такая комбинация не существует


Sold By
( 0 / 5 )

Share :
Direct from origin country
We accept returns for defective products only.
Click me to check detail policy.
Material Lead
Weight 50g-120g
Item No. Pencil Pendant
Licensable private label No
Whether the source of cross-border export is exclusive Yes
Type of patent None
Foreign trade export certification None
Quality Inspection Report No. None
Large amount Contact customer service
Brand Other
Shape Foot about 100g or Foot about 125g or Foot about 30g or Foot about 40g or Foot about 50g or Foot about 60g or Foot about 70g or Foot about 80g or Foot about 90g
Shipping Weight 0.03 kg
Shipping Length 2.3 cm
Shipping Width 1.5 cm
Shipping Height 1.15 cm
Shipping Volume 3.9674999999999994 cm³